Shanghai Power Station Auxiliary Equipment Plant-
Yangjiang nuclear power plant _1000MW condenser
The manufacture of the condenser for Yangjiang Nuclear Power Plant realized new breakthrough in the manufacture of the 1000 MW condenser. This condenser was put into operation in March 2014.

    Yangjiang 1#~6# 1000MW condenser;Fangchenggang 1#~4# 1000MW condenser; Karachi K2K3 1000MW condenser

Our company is one of the largest and most advanced condenser suppliers in the world, and leads the market share. Our design, manufacturing technology reach the international leading level. Products are used in Electric Power, Petrochemical and Environmental Protection fields etc. SAP has designed and manufactured the first CPR1000 nuclear power plant condenser and 1350MW fossil fuel power plant condenser successfully. At the same time, the company is also the organization unit of the national condenser standard JB/T10085, and has undertaken the national-level project development of the national 1000MW nuclear power CAP1400 and CAP1700.

Have the arrangement of heat exchange tube bundle with independent intellectual property, and its heat exchange performance is better than the HEI standard.Products can meet the requirements of back pressure from the cold weather condition unit to the warm weather condition unit, from direct water cooling unit to indirect air cooling tower unit.Single-shell type, two-shell type and three-shell type condensers can match the whole series of steam turbine low-pressure cylinders.Vibration analysis, strength calculation and other professional design to ensure the safety of the system.Customizable condenser design improve the economy of the system.

Contact Us
Shanghai Power Station Auxiliary Equipment Plant
Address:No. 621 Longchang Road, Shanghai,China
Post code:200090
Tel: 60708088
Fax:65430371