Shanghai Electric Group Automation Engineering Limited Company-
Nantong Energy Storage Lithium Battery Industry Base Project
The project is located in Nantong Economic and Technological Development Area, Jiangsu Province, with a total investment of over RMB 5 billion, an occupied area of 28 hectares and a total construction area of about 280,000 m2. After the project is completed, it will become the most advanced and the largest lithium-ion battery energy storage system industrial base in Shanghai-Nantong Area, with annual output of 4GWh energy storage battery and 4GWh power battery. The project will be constructed in two phases, of which the first phase will be conducted in the fourth quarter of 2019, with an investment of RMB 2 billion.

    The total investment exceeds RMB 5 billion, with an occupied area of 28 hectares and a total construction area of about 280,000 m2.

    Industry status: after completion, it will become the most advanced and the largest lithium-ion battery energy storage system industrial base in Shanghai-Nantong Area.


After completion, it will become the most advanced and the largest lithium-ion battery energy storage system industrial base in Shanghai-Nantong Area.

According to Electric Intelligent Manufacturing Action Plan in Shanghai, our automation has actively changed market concepts and business models this year, from technology-oriented to customer-oriented and from small project system integration to providing system solutions for large projects. It takes the first step of "equipment and service integration supplier" and provides the first phase of the intelligent factory in Nantong Base with battery production line, PACK production line, multiple equipment intelligent production lines of power system, logistics system and MES/IT system as well as comprehensive supporting services.

Contact Us
Shanghai Electric Group Automation Engineering Co., Ltd.
Address:No. 360, Mengzi Road, Huangpu District, Shanghai.
Post code:200023
Tel: 021-63350035
Fax:021-63018345-8320