Shanghai Electric Gas Turbine Co Ltd-
AE94.3A
AE94.3A, the F-class gas turbine, is one of the most widely used models in the domestic market in recent years. Its greatest feature is flexible and diverse, combined cycle configuration forms are rich, and it can meet all kinds of configuration including 1 on 1, 2 on 1, single-shaft, multi-shaft. The model uses a horizontal splitted cylinder structure, a central tied-rod rotor, a 15-stage axial compressor, a 2-stage adjustable IGV, a 4-stage axial flow turbine and a annular-type combustion chamber with 24 circumferentially VeLoNOx burners, which ensure low emissions while at a lower load range. In addition, AE94.3A gas turbine has the characteristics of flexible operation and quick start-up, which is suitable for peak shaving and grid frequency regulation. The normal loading rate is 13 MW/min, which can reach 22-30 MW/min when participating in peak load regulation of power grid. It takes only about 5 minutes from initial state to full speed no-load state during start-up of gas turbine, and only about 23 minutes from full speed no-load state to basic load.

Gas turbine, honored as the "crown pearl" of manufacturing industry, plays an unparalleled role in today's power generation field because of its cleanliness, environmental protection, fast and flexible. Shanghai Electric has been cooperating with its gas turbine industry since it acquired 40% stock of Ansaldo, Italy, in 2014. The main three gas turbines are AE94.3A, AE94.2 (or AE94.2K/KS), AE64.3A. They all have many characteristics, such as cleanliness, high efficiency and flexibility, which bring customers diversified options and efficient economic benefits.

AE94.3A is compact, reliable, easy maintenance, fast start and environmental sustainable.

The technical features are as below:

1) High efficiency 15-stage axial compressor, with 2 stages of VGVs, 1 annular combustion chamber and 24 Dry low NOX hybrid burners for both fuel gas and fuel oil, 4 stage turbine.

2) Robust rotor design with high stiffness, low weight, easy maintenacce on site.

3) Efficient and reliable secondary air system, featured Rotor Displacement System design.

4) Fast startup. Fast ramp and hot restart capabilities, time to reach base load within 30min.

5) NOx emission lowered up to 15ppm.

6) Fully assembled shipping for gas turbine. Highly integrated auxiliary systems.


Contact Us
Shanghai Electric Gas Turbine Co., Ltd.
Address:333Jiangchuan Road,Minhang District,Shanghai
Post code:200240
Tel: 021-23517588