| The constant efforts on creating activities and brand, upgrading products technology level, improving project management, setting up excellent credit standing and self-innovation, all of the above helps SETCO to be a competitive supplier of system integration in Chinese domestic mass transit. |
| Cars and Key Parts |
|
|
Cars ( SATCO )
·68 Metropolis Type C metro cars for Shanghai Xin Min (Line 5)
·168 Metropolis Type C metro cars for Yangpu Line (Line 8)
·84 Metropolis Type C metro cars for Pudong Line (Line 6)
·64 Metropolis Type A metro cars for Shanghai Line 1
·88 Metropolis Type A metro cars for Shanghai Line 2
·120 Metropolis Type A metro cars for Shanghai Line 10 |
| |
 |
| |
|
|
Traction System ( SATEE )
·Assorted traction equipment for Shanghai Line 3,8,5,6,1,2
·Assorted traction equipment for Nanjing Line 1
·Assorted traction equipment for Singapore Cycle Line
|
|
|
|
 |
| |
|
|
Power Supply System
·General Contracting of power supply system equipment for Shanghai Line 8 Phase 1
·Project of Procurement & Integration of power supply system equipment for Shanghai Line 2 west extension
·Project of Equipment Supply & Installation for Sheshan main transformer substation of Shanghai Line 9 Phase 1
·General Contracting of Equipment Supply & Integration for the main transformer substation of Shanghai Luchao port Railway Container Center Substation.
·General Contracting of Equipment Supply & Construction of traction substation, step-down substation and SCADA system for Shanghai Line 1, Fujin Depot
·Project of DC1500V Switch Cubicles Procurement for the continuous construction of Shenzhen Line 1 |
| |
 |
| |
|
|
SCADA
· SCADA system, FAS system, BAS system and Supervision and Control Center for Shanghai Pearl (Line 3) Phase 1
·SCADA integration & installment for Shanghai Line 2 west extension
·Station equipment, centralized air conditioning equipment supervisory system for Guangzhou Line 2
·The block & alternative PLC System of power supply system for TKO extension in HongKon
|
| |
 |
| |
|
|
Platform System
·Equipment supply & Installation for 3 stations of Shanghai Line 1 north extension
·Equipment supply & Installation for 17 stations of Shanghai Line 4
·Equipment supply & Installation for 22 stations of Shanghai Line 8
·Equipment supply & Installation for 19 stations of Shanghai Line 6
· Procurement & installation of escalators and elevators for Shanghai Line 2 west extension
|
| |
 |
| |
|
|
Depot
·Depot technical equipment for Shanghai Line 9 Phase 1
·Procurement of whole-set technical equipment for Shanghai Pearl (Line 3) north extension, rolling stock base
·Equipment Supply and Service for all workshops of shanghai Line 8, YInhang Depot
·Technical equipment integration for Shanghai Line 7, Chentai Depot
|
| |
|
| |
|
|
|
| |